Alfa Romeo/Alfa Romeo Digest Archive
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
SPICA throttle linkage adjustment
I'm having a problem getting the throttle set up properly on my '72 Spider.
The bellcrank stops are set correctly per the SPICA manual with 86.5 degrees
of rotation but I cannot get this much travel from the pedal linkage even
with the floor stop screwed all the way down and the cable bracket stop
screwed all the way out (giving maximum pedal travel). I'm assuming full
throttle should take it all the way to the bellcrank stop but haven't been
able to find any documentation on doing this setup.
Does anyone know if I'm doing this wrong or where I can find some info on
the procedure?
TIA
Paul Irvine - Antioch CA
72 Spider - 79 Sprint Veloce - 82 GTV6
---------------------------------------------
Project Alfa - back on the road soon
--
to be removed from alfa, see /bin/digest-subs.cgi
or email "unsubscribe alfa" to [email protected]
Home |
Archive |
Main Index |
Thread Index